East Langley Water Supply – Phase 1
Project description
In April 2013 Pedre Contractors Ltd. was awarded the East Langley Water Supply – Phase I
This multi-million dollar project consisted of the following work:
- Installation of 914.4mm OD welded steel water main and 600mm ductile iron water main.
- Installation of four(4) – 600mm line valves chambers.
- Installation of a meter chamber, 10 air valve chambers and 2 blowdown chambers.
- Trenchless crossings of CP Rail, Highway 10, and a watercourse.
Project details
- Project: East Langley Water Supply – Phase 1
- Category: Mechanical, Open Cut Utilities, Road Building, Trenchless
- Client: Metro Vancouver